FOSHAN XINGON LADDERS & SCAFFOLDINGS FACTORY

Work Platform for Wind Turbine Hub Assembly Line

Home > CASE > Products Case  > Work Platform for Wind Turbine Hub Assembly Line

Subscribe

Get email updates on new products

New Products

XG-227 【FIBERGLASS】 Extension Ladder (Optional Anti-tipping device Style)

XG-227 【FIBERGLASS】 Extension Ladder (Optional Anti-tipping device Style)

1.Model No:XG-227
2.Brand name:XINGON
3.Product description:Extension Ladder (Optional Anti-tipping device Style)
4.Material:Fiberglass
5.Size:8-14 steps
6.Type:Extension ladder
7.Feature:designed for use on Household, Storage, Construction, Engineering
8.Packing:pp bag
9.Payment terms:30%deposit,balance before shipment
10.OEM/ODM is available

XG-173 Series 【ALUMINUM】 Ring Lock Scaffolding

XG-173 Series 【ALUMINUM】 Ring Lock Scaffolding

1.Model No:XG-178 Series
2.Brand name:XINGON
3.Product description:Ring Lock Scaffolding
4.Material:Aluminum
5.Size:【Total height:2.8-13.4m】【Width:850mm / 1400mm】
6.Type:Ring Lock Scaffolding
7.Feature:designed for use on Storage / Construction / Engineering
8.Packing:pp bag
9.Payment terms:30%deposit,balance before shipment
10.OEM/ODM is available

XG-125LG 【ALUMINUM】 Multi-Use Telescopic Ladder

XG-125LG 【ALUMINUM】 Multi-Use Telescopic Ladder

1.Model No:XG-125LG
2.Brand name:XINGON
3.Product description:Multi-Use Telescopic Ladder
4.Material:Aluminum
5.Size:4×3-4×10 steps (1.56-5.48m [as A style] )
6.Type:Multi-purpose ladder
7.Feature:designed for use on Storage, Construction, Engineering
8.Packing:pp bag
9.Payment terms:30%deposit,balance before shipment
10.OEM/ODM is available

Latest News

Thailand

Thailand

2025-10-20 15:03:59

Welcome to XINGON【The 138th CANTON FAIR】

The United States

The United States

2025-10-17 09:56:46

Welcome to XINGON【The 138th CANTON FAIR】

Dubai-

Dubai-

2025-10-16 16:50:00

Welcome to XINGON【The 138th CANTON FAIR】

Philippines

Philippines

2025-10-15 17:17:52

Welcome to XINGON【The 138th CANTON FAIR】

Ireland

Ireland

2025-04-05 10:01:12

Welcome Ireland customers to visit XINGON to buy products

Malaysia

Malaysia

2025-02-15 14:20:27

Welcome Malaysia customers to visit XINGON to buy products

Dubai

Dubai

2024-04-20 14:11:25

Welcome Dubai customers to visit XINGON to buy products

Africa & Singapore

Africa & Singapore

2024-10-14 17:08:44

Friends from Africa and Singapore came to visit the factory

Work Platform for Wind Turbine Hub Assembly Line

2026-08-19 14:56:47


Industry: Renewable Energy / Wind Power Equipment Manufacturing

Application: Large wind turbine hub production‑line assembly


 

   Project Challenge

   Custom dual‑station platform resolves key assembly bottlenecks for 4MW‑10MW offshore wind hub mass‑production

 

    Custom R&D Solution

    The whole system contains two cooperating work stations, working together with AGV & trestle cart logistics.

Dual‑station

Intelligent


Project Challenge

Mass‑production of 4MW‑10MW offshore wind hubs exposed drawbacks of traditional assembly workflows. Unbalanced tact time, frequent crane conflicts, insufficient high‑altitude safety protection, poor AGV‑platform coordination and lack of safety interlocks restricted production capacity. Custom dual‑station assembly platform was developed to solve these manufacturing pain points.



Custom R&D Solution

Station 1: For heavy‑component hoisting & installation, spring‑buffered telescopic joints for gap‑free docking. 

Station 2: Double‑layer layout for fine assembly such as bolt embedding and cable wiring. Differentiated load capacity for heavy‑duty operation.

● PLC multi‑sensor safety interlock system enforces strict operation sequence to avoid mis‑operation.

● Integrated gas source & 220V power interfaces, reserved space for future 10MW+ models.



Project Achievements


+35% Assembly Efficiency:Balanced dual‑station tact time reduces crane waiting and shortens unit production cycle.

Eliminate Core Safety Risks:Personnel & trolley detection, sequential interlock and full fall‑protection barriers.

Smooth Automated Logistics:Perfect coordination of AGV, trestle cart and motorised opening‑closing platform.

Future‑proof Expandable Design:Covers 4MW‑10MW, ready for next‑generation larger wind turbine production.

It provides replicable standard solution for global on‑shore & offshore wind OEM production‑line upgrading.




dddddssssddddd